API Spec Q1 9th Edition

API QI 9th Edition Fundamental – as a INHOUSE Course

Posted on Updated on


How to prepare for an API Q1 9th edition INHOUSE course?

This API U approved FUNDAMENTAL course is a 2.5-day course and is delivered in-house by an API U approved Tutor.

Here is what are the bare minimum prerequisite for an organization that is interested in undertaking a

1. Have a minimum of 5 candidates

2. Should have a decent conference room with less disturbance

3. The conference room should be equipped with a LED TV with VGA connector or a Projector with VGA connector

4. The Candidates should go through at least the following

a. Contract review procedure of the company

b. Product Quality Plan for the specific product that the company produces

c. The Risk assessment and contingency plan f the company if available

5. It also very important that the candidates are allowed to concentrate on the course and are not disturbed by their colleagues during the course of training. This is very important as there is the tendency of the colleagues to make use of their accessibility during the course. This is a small but very important point to run the course as planned and to be able to deliver the planned deliverable in the allotted time.

6. The API Q1 Fundamentals course recognizes the importance of breaks. The Venue should have arrangements for refreshments ( tea/coffee etc)

 

For more details please go to our website  API Q1 Training Course

Puneet Sharma | Email: API.Training.In@Gmail.com

If you are Interested, Please fill out the Enquiry form below:

API Q1 Training

Posted on Updated on

API Q1 Training
API Q1 Training

API Spec Q1 Training

We are happy to introduce our Consulting, Training, and Auditing services to help companies demonstrate compliance/certification to International Standards. The practice areas we cover is primarily for Oil & Gas Industry specific Quality, Health, Safety and Environment (QHSE) solutions.

Some of the International Standards we cover are:

  • API Q1
  • API Q2
  • API Product Specification (Monogram License)
  • ISO 9001
  • ISO 14001
  • OHSAS 18001

Apart from these International Standards, we also provide similar services on several Quality Tools like Quality Planning, Risk Management, Supply Chain Management, Root Cause Analysis and Corrective Action, etc.

Our consultants have been providing consulting, training and auditing services for many years to companies serving Oil & Gas Industry globally. We are proud to mention that our consultants provided training and consulting services to a client on API Q2, which became the Best company to be certified to this International Standard. We experienced in design, implementation, and main, enhance of Integrated Management Systems.

For more details please go to our website API Q1 Training Course

 

Puneet Sharma | Email: API.Training.In@Gmail.com

If you are Interested, Please fill out the Enquiry form below:

 

API Q1 adds Risk management to 9th Edition

Posted on Updated on

API Q1 adds Risk management to 9th Edition

API Q1 9th Edition adds a  new clause on Risk Assessment and Management. It is positioned in the standard clause 5.3 under “product realization”. It has an important bearing throughout the standard and cross-references to Risk Assessment have been made directly and indirectly by other requirements of API Q1  9th Edition.

So what is Expected  by  this new clause of Risk Assessment and Management :

1 ) The organization is expected to maintain a documented procedure

2) The procedure should identify the techniques (tools)  and the process of application of these chosen tools through the stages of identification till risk mitigation.

3) The standard adds a NOTE mentioning considerations of Severity, detectability, and probability  of risk

4) Risk assessment has to be carried out for (a) Product Quality (b) Product Delivery

5) Records for Risk Assessment should be kept handy

So  How are the other clauses of API Q1 9th Edition  linked to this clause

  • Risk assessment is a input to the contingency planning ( 5.5)
  • Risk Assessment is actively linked to corrective(6.4.2) and preventive action( 6.4.3)
  • Risk Assessment is indirectly referenced in planning (5.2)
  • As an input to Design and Development ( 5.4.2)
  • Preventive maintenance (5.7.8)
  • Management of Change (5.11)
  • Management Review( 6.5.1)

Although  PQP, Product release, and  Initial Supplier Evaluation – Critical Purchases – may not  appear to refer to risk analysis and management, however in practice it is always required to consult as you prepare or review these

If you are Interested, Please fill out the Enquiry form below: